Project
Mandarin Oriental
Full ELV solution design
Designed the complete ELV solution and system architecture for Network, CCTV, Access Control and PA.
- Location
- Đà Nẵng
- Year
- 2024
- Role
- ELV Solution Design Engineer
Scope of work
- 01Complete ELV solution design
- 02Network system architecture
- 03CCTV system architecture
- 04Access Control system architecture
- 05PA system architecture
In a luxury hotel, ELV systems cannot be isolated islands. Network, cameras, access control and public address run on the same infrastructure and serve one building operating around the clock, and a design decision in one system directly affects the others. The challenge of the design stage is to see all of it as one whole from the start.
My role: complete ELV solution design
On this project I was responsible for the complete ELV solution design and for the system architecture of Network, CCTV, Access Control and PA. This work comes before any installation: if the architecture is right, deployment goes smoothly; if it is wrong, no amount of good equipment can compensate.
Network architecture: the foundation for every system
The network is the layer CCTV, Access Control and PA all depend on. The architecture must plan segmentation for each system, PoE supply, camera bandwidth and link redundancy up front, so the systems share one infrastructure without affecting each other.
CCTV and Access Control: layered security
The CCTV and Access Control architecture was designed to complement each other: cameras show what happened, access control shows who was authorised to be there. Designing for integration from the start makes linking the two systems later simple rather than patchwork.
PA: announcements for the whole building
The PA system must be zoned to match how the building operates, so announcements reach the right areas without disturbing others.
Why complete design matters
When ELV systems are designed separately by each contractor, problems such as bandwidth conflicts, insufficient PoE power or overlapping network zones often appear only after installation. Complete design finds and resolves them on the drawing, where the cost of change is lowest.